CCTA Course Search

Search Results

Found 291 records / Displaying 201 - 250
Name Title Terms GBA date
ABC226 Raceways, Wiring Devices, Boxes and Fittings 1996 Spring - 2003 Spring 11-28-1995
ABC230 Stair Construction 2014 Fall - Current 10-26-2004
ABC230 Stair Construction 2005 Spring - 2014 Summer 10-26-2004
ABC230 Stair Construction 1994 Fall - 2004 Fall 3-22-1994
ABC231 Exterior Wall Finishes 2005 Spring - Current 10-26-2004
ABC231 Exterior Wall Finishes 1994 Fall - 2004 Fall 3-22-1994
ABC232 Roofing Applications 2005 Spring - 2008 Fall 7-22-2008
ABC232 Roofing Applications 1994 Fall - 2004 Fall 3-22-1994
ABC233 Construction Supervision 2005 Spring - 2008 Fall 7-22-2008
ABC233 Construction Supervision 1995 Spring - 2004 Fall 11-22-1994
ABC234 Finish Stairs 2005 Spring - 2008 Fall 7-22-2008
ABC234 Finish Stairs 1995 Spring - 2004 Fall 11-22-1994
ABC235 Laser Instruments for Carpenters 2005 Spring - 2008 Fall 7-22-2008
ABC235 Laser Instruments for Carpenters 1995 Spring - 2004 Fall 11-22-1994
ABC236 Metal Studs and Drywall 2005 Spring - 2008 Fall 7-22-2008
ABC236 Metal Studs and Drywall 1995 Spring - 2004 Fall 11-22-1994
ABC237 Interior Finish: Doors and Windows 2005 Spring - 2008 Fall 7-22-2008
ABC237 Interior Finish: Doors and Windows 1995 Fall - 2004 Fall 3-28-1995
ABC238 Advanced Walls, Floors and Ceilings 2005 Spring - 2021 Summer 10-26-2004
ABC238 Advanced Walls, Floors and Ceilings 1995 Fall - 2004 Fall 3-28-1995
ABC239 Cabinetry 2005 Spring - 2021 Summer 10-26-2004
ABC239 Cabinetry 1995 Fall - 2004 Fall 3-28-1995
ABC250 Advanced Piping Blueprints/Drawings 2003 Spring - 2008 Fall 7-22-2008
ABC250 Advanced Piping Blueprints/Drawings 1994 Fall - 2002 Fall 3-22-1994
ABC251 Advanced Trade Calculations-Pipefitter 2003 Spring - 2021 Summer 11-26-2002
ABC251 Advanced Trade Math-Pipefitter 1994 Fall - 2002 Fall 4-26-1994
ABC252 Motorized Equipment/Testing-Piping 2003 Spring - 2008 Fall 7-22-2008
ABC252 Motorized Equipment/Testing-Piping 1994 Fall - 2002 Fall 3-22-1994
ABC253 Aboveground Pipe Installation 2003 Spring - 2008 Fall 7-22-2008
ABC253 Aboveground Pipe Installation 1997 Spring - 2002 Fall 10-22-1996
ABC253 Aboveground Pipe Installation 1995 Spring - 1996 Fall 11-22-1994
ABC254 Field Routing, Trim and Springs 2018 Fall - 2021 Summer 11-26-2002
ABC254 Field Routing, Trim and Springs 2003 Spring - 2018 Summer 11-26-2002
ABC254 Field Routing, Trim and Springs 2000 Summer I - 2002 Fall 3-28-2000
ABC254 Field Routing, Trim and Springs 2000 Spring - 2000 Spring 12-14-1999
ABC254 Field Routing, Trim and Springs 1995 Spring - 1999 Fall 11-22-1994
ABC255 Valve Installation 2003 Spring - 2008 Fall 7-22-2008
ABC255 Valve Installation 2000 Summer I - 2002 Fall 3-28-2000
ABC255 Valve Installation 1995 Spring - 2000 Spring 11-22-1994
ABC256 Basic Plumbing 2018 Fall - Current 4-25-2017
ABC256 Basic Plumbing 2017 Summer - 2018 Summer 4-25-2017
ABC256 Basic Plumbing 2009 Spring - 2017 Spring 6-24-2008
ABC256 Basic Plumbing 2005 Spring - 2008 Fall 10-26-2004
ABC256 Basic Plumbing 1995 Spring - 2004 Fall 11-22-1994
ABC257 Advanced Pipe Fabrication 2003 Spring - 2008 Fall 7-22-2008
ABC257 Advanced Pipe Fabrication 1995 Fall - 2002 Fall 3-28-1995
ABC258 Work Planning and NDE Testing 2003 Spring - 2008 Fall 7-22-2008
ABC258 Work Planning and NDE Testing 1995 Fall - 2002 Fall 3-28-1995
ABC260 Induction Motor Maintenance 1995 Spring - 1995 Fall 11-28-1995
ABC261 Adv Controls and Signaling Systems 1995 Spring - 1995 Fall 11-28-1995